GHD Head Office
Hurst Joinery Projects manufactured and installed a bespoke joinery package for cult hair brand GHD at their head office in Leeds.
Project Challenges
Manufacture of large curved timber tunnel 9.5m wide and 8m long to form catwalk reception entrance (which can be seen in construction to the right) with Corian floor and upholstered banquette seating.
The project also included a high specification boardroom with leather wall panelling, multi-functional training academy with walnut credenza storage units and luxurious break out areas with gold upholstered banquette seating and walnut stand up benches.
DOWNLOAD the full case study here.