Project: Copthall Bridge

Client: The HACS Group
Location: Harrogate

Brief

Hurst was appointed to deliver bespoke joinery and tiling packages as part of the transformation of an existing building into over 30,000 sqft of high specification, Grade A serviced office space.

This marked the third collaboration between Hurst Joinery Projects and the HACS Group, following successful projects at Yorkshire Cancer Research and the Police Treatment Centre.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Result

Hurst’s responsiveness and reliability, during both manufacture and installation, ensured the joinery was delivered in line with the client’s programme and high design standards. The joinery elements contributed significantly to the overall finish and character of the space, while the premium tiling works complemented these features to create a cohesive and polished interior.

The client was extremely satisfied with the end result, praising Hurst’s expertise, quality of product and collaborative approach throughout the process.

Items Produced

  • Staff co-working and private kitchenettes & teapoints
  • Reception oak-panelled AV wall and feature wall with integrated cupboards and planter
  • WC communal vanity unit
  • Banquette seating with integrated mirrors and planters
  • Oak-framed, foam and fabric wrapped panels in boardroom and individual study rooms
  • Oak handrails & seat cappings
  • Panelled TV surround and wall mounted framed mirrors with LED-lit shelved recesses
  • Tiling works included across the ground floor main reception and lift lobby areas, kitchen zones, washrooms and external entrance steps

Challenges

Hurst were tasked with delivering bespoke joinery across multiple floors, with each space serving a different function and requiring its own design approach. A high standard of finish had to be maintained across all areas of the building.

Installation required thorough planning and flexibility to coordinate effectively with other trades. Due to the site’s location off a busy main road, deliveries were carefully managed to limit disruption.

Solution

Hurst worked closely with the client and design team from the early stages, providing technical input and design expertise throughout the tender and scheme development process.

Joinery elements, including wall panelling, cupboards, banquette seating, teapoints and planters were designed to enhance the reception, communal areas, boardrooms and co-working spaces, combining style with practical functionality.

Alongside this, Hurst’s tiling division delivered high-quality finishes to the reception, lift lobbies, kitchen areas, washrooms and external entrance, ensuring the interiors were not only visually striking but also durable and practical for everyday use.